SHARE

Local 720 Edmonton Ironworkers assisted by 955 O/E Crane operators assemble a new bridge.  Watch as each piece gets put into place with the use of rigging, slings, wrenches while workers are far above ground.  This video shows a great deal of the bridge being assembled.